Distribution center in Mascouche
GROUP ST-HUBERT
Context
With the challenge of reducing its storage costs and centralizing its distribution, Group St-Hubert called on the FRARE GALLANT team for our expertise in the construction of agri-food plants & distribution centres.
Thus, in collaboration with the OLEADEV real estate group, we could offer St-Hubert a turnkey project and meet all their needs; from finding the perfect location at the intersection of Highway 640 and 25, to designing and constructing a state-of-the-art warehouse of over 100,000 square feet. The building includes various storage areas for dry, refrigerated, and frozen products and office spaces.
This major project has enabled St-Hubert to increase its storage capacity and optimize its distribution to its rotisseries and numerous points of sale across the province.
Type of service: Design-build stipulated price contract
Date: 2021/2022
Size: 100,000 sf







